The project is located: In Riva, an area intertwined with nature in Asian Istanbul, about 30 minutes from Istanbul Airport, Sabiha Gokcen Airport and Ataturk Airport, 6 km from the Ring Road and 30 km from Maslak.
The project consists of: From 1400 villas spread over a picturesque area of 1 million and 157 thousand square meters, this beautiful area is located on a high point overlooking a stunning view of the Valley of Dreams of the Riva River and the Black Sea. The project is divided into 3 phases, the first phase, which includes 509 villas of styles (2 + 1, 4 + 1, 5 + 1), the second phase includes 199 villas (3 + 1 (5 + 2) and the third phase includes 692 villas and is located in the project on a garden area 70,000 square meters, a private forest area of 207 thousand square meters, a biological pond, La Cuna lake swimming area, a permaculture facility where you can grow natural products and a gastronomy center.
Project services:
- Shops, restaurants and cafes
- A public and also private school within the project
- Collector inside the project
- A private medical center for the project
- Green spaces and open gardens
- Helipad
- Lakes extending to 25 thousand square meters
- La Cuna lake for swimming
- Tennis, basketball and football courts
- Children's playgrounds
- Turkish bath sauna
- Swimming pool
- Cinema hall
- meeting rooms
- Forests and agricultural lands designated for the project
Project location:
- Too close to the road HAVE highway and ring road
- It is 5 minutes from Yavuz Sultan Selim Bridge
- It is 15 minutes from Sultan Mehmet Al-Fateh Bridge
- Garden 8.34 km away
- School 5.1 km away
- Mosque is 6.5 km away
- The project is far from Istanbul's new airport: 48.9 km
- It is also away from Sabiha Gokcen Airport: 49.9 km
- It is also away from the city center: 33 km
- And away from the center of the region: 14.4 km
- The Black Sea is 3.6 km away
- Beach is 3.6 km away, Halis Koi Beach is 3.9 km away
Payment method:
Cash..
Or a down payment of 35% and the rest in installments up to 16 months.
The project is under construction and is divided into 3 phases:
The date of delivery of the first phase 30/12/2021.
The date of delivery of the second phase is 12/30/2023.
The date of delivery of the third phase is 12/30/2025.